Enka Scpx Pipe Culverts

South Caucasus Pipeline

Enka Scpx Pipe Culverts

South Caucasus Pipeline

ENKA SCPX PIPE CULVERT  PROJECT
Project Name                   :              ENKA South Caucasus Pipeline Expantion Project 
Project Place                     :              Tbilisi / GEORGIA    -  Ankara / TURKEY
Project Date                      :              2014 / 2015
Project Details                  :              D:1000-1260 mm             L: Different sizes ( 3120 – 900 )
                                                           D:1500-1740 mm             L:Dİfferent sizes  ( 3120 – 600 )
                                                           Total:    99 pieces                            

ENKA, with its JV partner Bechtel, has been working on the expansion of the South Caucasus Pipeline (SCPX) project for all early works required and construction of Compressor Station Georgia-1 & 2 (CSG-1 & CSG-2) and the Pressure Reduction and Metering Facility (AREA 81) in Georgia. The scope also includes the construction of a 15 km Access Road to CSG-2 and brownfield modifications within the existing facilities of the SCP Pipeline. Till today, by way of using the highest safety, quality and environmental standards, 3 million man-hours were spent without a Lost Time Incident.

  • DATE:
  • PLACE:

    Tbilisi / GEORGIA

  • CLIENT:

    ENKA South Caucasus Pipeline Expantion Project

  • LINKS:
    •  

Page Gallery

  • 3
  • 2
  • 6
  • 4
  • 8
  • 5